DUP-X›Report & handover›Reports & Handover
SIM RUNNING
REPORTING / HANDOVER

Reports & Handover

DDR harian dari spud hingga close out, handover, biaya, NPT dan kelengkapan laporan akhir sumur.

Cadence 2 s • deterministik
Drilling Operational FlowDashboard Realtimev2.27 · remake
06 · Report & handover
Analisis mengikuti sumur dan skenario aktif pada selector atas.← Decision & shadow

DDR journey / register

Revision local to this browser • 3 entries

IDDateShiftDepthSummary
DDR-0012026-11-01Hari2.180 mDrilling 8½″, parameter stabil, tanpa NPT.
DDR-0022026-11-02Malam2.320 mWiper trip, survey gyros, lanjut drilling.
DDR-0032026-11-03Hari2.450 mDrilling aktif • demo baseline 24 channel.
DUP-X / Portable intelligence, connected operations.Prototype v2.27 • remakeTanStack Start•Data simulasi•Asia/Jakarta