REPORTING / HANDOVER
Reports & Handover
DDR harian dari spud hingga close out, handover, biaya, NPT dan kelengkapan laporan akhir sumur.
Cadence 2 s • deterministik
Drilling Operational FlowDashboard Realtimev2.27 · remake
06 · Report & handover
Analisis mengikuti sumur dan skenario aktif pada selector atas.← Decision & shadow
DDR journey / register
Revision local to this browser • 3 entries
| ID | Date | Shift | Depth | Summary | |
|---|---|---|---|---|---|
| DDR-001 | 2026-11-01 | Hari | 2.180 m | Drilling 8½″, parameter stabil, tanpa NPT. | |
| DDR-002 | 2026-11-02 | Malam | 2.320 m | Wiper trip, survey gyros, lanjut drilling. | |
| DDR-003 | 2026-11-03 | Hari | 2.450 m | Drilling aktif • demo baseline 24 channel. |