SPECIALIZED / HIGH TEMPERATURE
DUP Geothermal
Thermal, gas monitoring, aerated drilling dan loss surveillance.
Cadence 2 s • deterministik
Drilling Operational FlowDashboard Realtimev2.27 · remake
04 · Engineering & analisis
Analisis mengikuti sumur dan skenario aktif pada selector atas.← Wellsite geologyDecision & shadow →
TW-05Talang • South SumatraSection 8½″Oil & GasDrilling • Demo
Built for high-temperature operations.GT-04 baseline thermal profile • data simulasi.
Bottomhole temperature
230°C
Geothermal gradient demo
Annulus pressure
2.503psi
Screening
Non-condensable gas
0,38%
CO₂/H₂S proxy (demo)
Loss rate
6GPM
Loss surveillance
Thermal & loss surveillance
Aerated / foam input workspace
Single-phase demo
Geothermal engineering gates
- Gate 1 — Temperatur di bawah rating MWD/LWD sebelum masuk section panas.
- Gate 2 — Loss zone terpetakan; LCM plan & aerated switching criteria siap.
- Gate 3 — NCG (CO₂/H₂S) monitoring aktif; threshold demo 2%.
- Gate 4 — Cementing program suhu tinggi (retarder schedule) tervalidasi.